Beneficial Use of Dredged Sediments
2021-7-9 · • In March 2020 approximately 4,200 cubic yards of dredged sediment was placed on Sturgeon Island prior to interruption due to COVID 19. Material from the NJIW was pumped to a Y-valve on the island which split flow between a pipe with a nozzle and an elevated sediment distribution pipe (see figure above). The distribution pipe
Get Price